RD307 - Quarterly Performance Report of the Virginia Telecommunication Initiative Q1 FY2026 Report
Executive Summary: Virginia funds broadband deployment within the Commonwealth through several programs. The largest and main program is the Virginia Telecommunication Initiative (VATI). VATI provides grants to localities partnered with internet service providers to finance the deployment of high-speed broadband to locations (called a “passing") within the Commonwealth that are determined to be “unserved." Passings are places where the internet can be accessed – thus it could be a business, community anchor, a home, or an apartment complex. A passing is unserved(*1) if it lacks access to internet speeds of 100 megabits per second (Mbps) download and 20 Mbps upload (“100/20"). This quarterly report is required by statute and has been prepared by the Office of Broadband located within the Virginia Department of Housing and Community Development (DHCD). This report tracks the technical performance of the VATI provider partners in their work to deploy broadband. This report adheres to the factors that the General Assembly directed to be tracked and resents them in the manner directed by the General Assembly. Below are the key takeaways from the report. Only open projects are listed in the summary tables provided at the end of this report. Completed projects are not listed; however, their total figures are listed in the summary bullets below. • Total passings: VATI FY2022, FY2023, and FY2024 projects will provide access to broadband infrastructure to 320,402 passings across Virginia. • Leveraged local and private funding: In addition to $822.8 million in state and federal funding awarded, FY2022, FY2023, and FY2024 projects leverage a total of $1.198 billion in private and local-match funding. To date, $393.8 million of these awarded funds and $599.6 million of these matching funds have been expended. • Locations Built-To: To date, projects have provided broadband access to 155,907 locations. • Maximum Speeds Available: Over 93.4% of projects funded in FY2022, FY2023, and FY2024 offer functionally gigabit (1,000 Mbps) download speeds, and over 73.7% offer functionally gigabit upload speeds. In conclusion, 21 out of the 55 open projects funded from the American Rescue Plan Act of 2021 and General Funds from FY2022, FY2023, and FY2024 are scheduled to be completed on time as of this report’s submission. DHCD identifies 34 projects at risk for incompletion or underperformance. Justification for these delays include the make-ready effort, which includes preparing existing electric poles for aerial broadband network construction. Other delays involve supply chain and labor markets, streamlining utility locate efforts, railroad crossings, the permitting process to lay fiber in state-owned rights of way along roads, and permitting to cross federally owned lands. DHCD will continue its ongoing work to monitor these projects, assisting in mitigating these broadband deployment challenges where appropriate. |